First, declare the drawings, information directory and volume
(A) supporting new works in Sheung Shui
1, drawings
(1) Municipal Water Supply Project (bound, and size is 30 X21cm)
a, the floor plan of building a regional water supply (including a CD-ROM); approval by the planning departments of the comprehensive network of copying a map, a blueprint.
b, to the horizontal and vertical section plans two sets, and bound volumes.
(2) three networks (and bound, and size is 30 X21cm)
a, approval by the planning departments of the comprehensive network of two copies of plans
Blueprint for a comprehensive pipeline network, a copy of the floor plan, a blueprint for all.
b, water supply networks in three floor plans, a CD-ROM.
c, indoor water supply and drainage drawings (including residential secondary pressure pump station drawings)
Two sets.
Drawings were more than 1:500 ratio
2, information
(1) a photocopy of project approval and siting of the two copies of written submissions.
(2) fill out the "water applications," a.
(3) "zone of urban water supply approval application form" three.
(B) temporary support works in Sheung Shui
1 approval by the planning department of 1:500 a location map of the plane.
2, "construction project construction personnel applications for temporary living water" a.
3, project approval and a photocopy of a photocopy of a site submissions.

(Submitted by the project management business lobby)

Second, the process of service delivery
(A) declaration
1, the CMC users to the service center for 2-42 window "of urban water supply development zones approved the application form."
2, users will be drawings (including residential secondary pressure pump station drawings), the information reported by the project management business lobby, to review the drawings.
3, drawings after passing the examination, notify users receive audit opinion forms and plans
-- (A).

Responsibility: Zhang Yanmei Tel: 87319356

(B) internal approval
1, director of business by working days in a "water applications," signed opinions.
2, Jie Shuiban two working days to complete the scene examination of water-saving projects, approved water
Indicators, Jieshui Ban, director of the "water applications," signed opinions.
3, the company manager in charge of working days in a "water applications," signed opinions.
4, technology room three working days on-site investigation and preparation of project estimates.
5, drawings and the preparation of the budget after the completion of technology users receiving notice that the room with drawings of the budget, users need to three working days of the confirmation of the budget and the budget after the official seal of the stamping unit sent to the technical room (this is not working days With the water working days).

Responsibility: Sun Jing Tel: 87308029
(C) Construction
Construction must be a qualified construction units.
(D) of the final acceptance
After the completion of works, two working days by the business organization Jieshui Ban, the user, Shi
The units and departments concerned to carry out the handover of acceptance, acceptance of qualified engineering,
The completion of the completion of information and technical drawings by the reference to business archive room.

Responsibility: Hu Tel: 87306929 ?
(5) Kaishuan water
1, works acceptance qualified, after the completion of the transfer of information, two working days for cleaning pipelines and water quality tests.
2, or user fees for water collection procedures:
(1) enterprises collection of water users must apply for micro-payment system by regularly
Hutchison business.
(2) residential users by the developer or construction of housing units filled out a "new
Residential water user registration form. "
3, users sign "for the city water contract"
More complete procedures, a working day for Kaishuan water.

Responsibility: Wang Kai Tel: 87308041