Guide to application for water consumption:
  A. On the installation of indoor and outdoor pipes, customers must present the design blueprint (two sets) to the Company's Business office for approval, to which the project can be carried out.
  1. Documents for temporary water consumption: unit letter of introduction, project approval, plane location drawing (1:500).
  2. Documents for formal water consumption: unit letter of introduction, project approval, plane drawing of factory area water supply (1:500), general pipe net plane drawing (1:500), vertical section drawing and indoor water supply system drawing.
  B. Procedure:
  1. Customer is to fill out a "Design Entrustment" at the Business office. (1 day) 2. Transfer the "Design Entrustment" to Water-saving office for water consumption quota (1 day). The Water-saving office and the designer make the inspection and decide the quota (1-3 days).
  3. The business office and Water-saving office present the inspection and quota result to the executive manager for approval and then transfer it to the designers (1-2 days).
  4. The designers start the project design and the project budget for the project construction company (2-4 days).
  5. The project construction company notifies the customer to pay the construction cost and arrange the construction (1-3 days), 6-14 days in all. The construction duration will be stated in the construction contract.
  6. When the construction is completed, no water supply can be unbolted until the construction is checked and approved (3-4 days).
  C. Application for unbolted water entails unit letter of introduction and entrustment agreement for water payment, to be followed by the procedure of water examination, unbolting and examination fee payment (2-3 days).